Glenpool Water Tower
Status: COMPLETE Allocation: $1,540,641.00 This two-part project began with a master Water Distribution System Study in 2015 that evaluated the existing distribution system. It addressed the need for a second water storage facility (tower) for anticipated growth in the south part of…