Jenks Trail System Extension
Trail System Extension
Status: COMPLETE
Allocation: $454,058.13
The project extended the existing Oklahoma Trail System in Jenks in two locations.
One new portion runs on the east side of South Elm Street between 111th and 121st streets. The second runs along the north side of 111th Street between Elm and Elwood. The trail extensions were finished in the summer of 2017.
Design: Marquardt Engineering
Construction: Tri-Star Construction, LLC